亚洲福利一区二区|无码欧美gogo大胆啪啪|青青久久久国产线免观|a级粗大硬长爽猛视频免费|国产一级淫片免费播放电影|91se在线看片国产免费观看

Engineering Installation > ENGINEERING CASE

88000Nm3/h PSA decarbonization device

Time:2014-8-13



The main equipment

The adsorption tower, oil / coke separator, buffer tower, program control valves and other valves and pipe etc..





Our company is "Huaqiang" made 1#, 2#, 3# pressure swing adsorption system installation, including nitrogen absorption reactor and hydrogen reactor, all welded byargon arc welding.


The main pressure swing adsorption performance

→ 1# pressure swing adsorption tower, non-standard equipment fabrication and installation and heat treatment, including adsorption tower, gas water, coke filter, fine desulfurization tower, heat treatment furnace and other equipment, the total weight of about 659.74 tons;

→ 120000 tons of pressure swing adsorption equipment, pipeline installation, including adsorption tower, cyclone separator, coke filter, fine desulfurization tower, a buffer tank, a vent pipe etc.. The whole system for purging, pressure test, the leakage test;

Technological transformation 2800 adsorption tower, phi;

→ 1# pressure swing adsorption transformation equipment installation and piping,including static, operation of equipment, piping in place, the new valve etc..




錯綜復雜的工藝管道相對我們簡(jiǎn)單



變壓吸附一次開(kāi)車(chē)成功


ON劃詞翻譯ON實(shí)時(shí)翻譯

1# pressure swing adsorption tower, non-standard equipment fabrication and installation and heat treatment, including adsorption tower, gas water, coke filter, fine desulfurization tower, heat treatment furnace and other equipment, the total weight of about 659.74 tons;

? 2014 Chengdu Zhiyuan Machine Science & Technology Co., Ltd. / TEL:028-85266505 85266063 85266506 / FAX:028-85266506-8009 / Email:cdzykj2002@163.com
ADD:D1-1301, Fund International Plaza, No. 6, Hangkong Road, Chengdu, Sichuan

亚洲福利一区二区|无码欧美gogo大胆啪啪|青青久久久国产线免观|a级粗大硬长爽猛视频免费|国产一级淫片免费播放电影|91se在线看片国产免费观看